Servicing Victoria & Western Australia in the remedial, construction, and protective coatings industries.

office@awsaus.com.au 451 Whitehorse Road, Mitcham VIC 3132

Case studies

25+ years of work, from heritage to modern landmarks

Bridges, freeways, shopping centres, hospitals, water infrastructure, and heritage buildings. AWS is accredited with most major Australian manufacturers and keeps its technicians trained as methods change.

Projects

Browse our work

Filter by the type of work to find projects like yours.

Westfield Facade
Facade

Westfield Facade

VIC

Concrete and veneer repairs, repointing, new mastic, repainting, and waterproofing at Westfield Doncaster, worked from platforms instead of scaffolding.

Read case study
NSW Water Project
Water infrastructure

NSW Water Project

NSW

Flume pipes abrasive blasted, primed, and coated with a polyurea system from scaffold.

Read case study
M80 Freeway
Freeway

M80 Freeway

VIC

Stress cracks in the road barrier system injected with epoxy resin. All work was done at night, on time and on budget.

Read case study
Mantra Terrace Hotel
Hotel

Mantra Terrace Hotel

QLD

Refurbishment of 86 guest rooms, the restaurant, and reception, including new joinery and epoxy flooring.

Read case study
Flinders Street
Heritage

Flinders Street

VIC

Heritage-listed balustrades encapsulated, stripped of lead paint, and recoated with a two-part epoxy.

Read case study
Warragul Wastewater Treatment Plant
Joint remediation

Warragul Wastewater Treatment Plant

VIC

Joint remediation on two bio-reactors: new joint sealing systems, high-pressure epoxy crack injection, and water plugs to stop live leaks.

Read case study
Federation Square
Expansion joints

Federation Square

VIC

Failed expansion joints assessed and removed, then replaced with joint types matched to the movement in each area.

Read case study
M5 Motorway
Mechanical joint

M5 Motorway

NSW

A faulty mechanical expansion joint in an asphalt road replaced with the Granor system and sealed with silicone.

Read case study
Westfield Doncaster
Leak and joint repair

Westfield Doncaster

VIC

A long-running leak traced with concrete x-ray and water testing to an old escalator void, then fixed with a combi joint, grout, and a polyurea membrane.

Read case study
Garden City Shopping Centre
Expansion plates

Garden City Shopping Centre

WA

Expansion plates lifted, a protective membrane applied underneath, and the plates reinstalled.

Read case study
Kororoit Creek Bridge
Bridge inspection

Kororoit Creek Bridge

VIC

Level 2 condition assessment of two bridges to the VicRoads Road Structure Inspection Manual, using an under-bridge unit.

Read case study
Park Road Bridge
Concrete repair

Park Road Bridge

VIC

Concrete cancer and impact damage repaired on the slabs and bollards, with scaffolding, traffic management, and new asphalt.

Read case study
Ballarat Road Bridge
Concrete cancer

Ballarat Road Bridge

VIC

Loose concrete removed, exposed reinforcement treated against corrosion, and the section rebuilt with structural grout.

Read case study
Evan Walker Bridge Platform
Structural stabilisation

Evan Walker Bridge Platform

VIC

More than 17,000 polypropylene blocks installed from a barge and scaffold to stop the walkway slats moving and rattling.

Read case study
Evan Walker Bridge
Bridge painting

Evan Walker Bridge

VIC

The arch encapsulated over the Yarra River, sandblasted, and repainted for the City of Melbourne.

Read case study
Bryn Mawr Blvd Bridge
Abutment works

Bryn Mawr Blvd Bridge

VIC

Abutment rehabilitation with new drainage channels, cut-off drains, and rock beaching to stop erosion.

Read case study
Andrew Park Drive Bridge
Guardrail

Andrew Park Drive Bridge

VIC

Guardrail installation to improve safety on the bridge.

Read case study
Queens Street Bridge
Timber decking

Queens Street Bridge

VIC

Damaged bearers and timber decking replaced with new ironbark boards and bearers.

Read case study
M1 Bridge Bypass
Bridge maintenance

M1 Bridge Bypass

Crack injection, structural concrete repair, joint sealing, and waterproofing on failed walls and movement joints.

Read case study
Federation Square Roundabout
Roundabout upgrade

Federation Square Roundabout

VIC

Roundabout upgrade at Federation Square.

Read case study
Point Lonsdale Lighthouse
Heritage concrete

Point Lonsdale Lighthouse

VIC

A WW1 bunker at risk of collapse stabilised with concrete injection, stitching, patch repairs, and steel supports for Queenscliff Council.

Read case study
Royal Children's Hospital
Helipad coating

Royal Children's Hospital

VIC

A failing rooftop coating replaced with a glass-filled coating approved for aviation use.

Read case study
Lennon Mills Silos
Concrete silos

Lennon Mills Silos

VIC

Spalling repaired on the concrete silos, then protected with a fade-resistant polyurea coating.

Read case study
Nufarm Saline Pits
Pit remediation

Nufarm Saline Pits

VIC

Corroded saline pits sandblasted, reinforcement primed with zinc-rich epoxy, the concrete repaired, and the pits waterproofed.

Read case study
Custom House Lane
Services pit

Custom House Lane

VIC

Stormwater pipework rebuilt, the services pit stabilised, and the pit lined with a protective coating.

Read case study
Hyatt Regency Perth
Ramp repair

Hyatt Regency Perth

WA

Damaged concrete on the north ramp repaired, then protected with coatings.

Read case study
John Forrest Secondary College
Epoxy flooring

John Forrest Secondary College

WA

Floors coated with the Dulux Luxafloor LGE epoxy system.

Read case study
DFO Box Gutter Replacement
Roofing

DFO Box Gutter Replacement

VIC

203 linear metres of 600 mm box gutter replaced with falls to Australian Standards, for Vicinity Centres.

Read case study
Glen Eira Laneway Drainage
Drainage

Glen Eira Laneway Drainage

VIC

225 metres of bluestone laneway lifted, new RCP drainage and junction pits laid, and the pavers reinstated.

Read case study
Palais Theatre
Heritage

Palais Theatre

VIC

Heritage upgrade of the theatre for the City of Port Phillip: structure, floors, joinery, glazing, and services.

Read case study
Darebin Council Structure
Structural

Darebin Council Structure

VIC

Heritage beams replaced with new steel while the structure was temporarily supported.

Read case study
Mackie Road Reserve
Roofing

Mackie Road Reserve

Old insulation and roof sheets replaced with new insulation and a Surfmist Klip-Lock roof.

Read case study
Victory Park Pavilion
Roofing

Victory Park Pavilion

Commercial roofing works at the pavilion.

Read case study
Gwendoline Community Centre
Refurbishment

Gwendoline Community Centre

VIC

Renovation with new joinery, 12 toilet partitions, electrical upgrades, and two automatic doors.

Read case study
Changing Places Facility, Brighton
Accessible facility

Changing Places Facility, Brighton

An old amenities block on the Brighton foreshore turned into a fully accessible Changing Places facility.

Read case study
Horsham Nature and Water Play Park
Landscaping

Horsham Nature and Water Play Park

VIC
Read case study
Rosanna Village Streetscape
Streetscape

Rosanna Village Streetscape

VIC
Read case study
Bubup Nairm Children's Centre
Construction

Bubup Nairm Children's Centre

VIC
Read case study
Penrith U3A Refurbishment
Refurbishment

Penrith U3A Refurbishment

NSW

A full refurbishment of the Penrith U3A building, from structural improvements to new finishes.

Read case study
Buluk Park Decking
Timber decking

Buluk Park Decking

Read case study
Narre Warren Bowls Club
Construction

Narre Warren Bowls Club

VIC
Read case study
ANSTO Nuclear Plant Works
Polyurea

ANSTO Nuclear Plant Works

NSW

The cooling tower basins at ANSTO’s nuclear facility relined with a high-performance polyurea coating.

Read case study

Have a project like these?

Talk to our team about your site, scope, and timeframe.