Westfield
Expansion Joints Repair

Scroll to learn more

Expansion Joints Repair

AWS was engaged to sort out an existing problem at Woolworths Doncaster which had been an issue for years. Through concrete x-raying and water testing we were able to determine that this was the site of an old escalator which was not evident with the current structure. With a solution that was designed by AWS we cut back the concrete and with a combination of combi joint, construction grout and polyurea membrane we were able to once and for all solve the problem.

 
WhatsApp Image 2021-01-08 at 3.03.45 PM (6)

AWS is here to serve you. Get in touch today by clicking on one of the buttons below.

lightbulb