Platform Reinforcing
AWS SERVICES were engaged by CityWide Infrastructure to structurally stabilise the foot bridge slats that run horizontally across the bridge. AWS supplied and installed over 17,000 polypropylene bloacks to rid the structure of the noise and movement of the slats along the walkway. AWS set up a barge and scaffolding system to enable works to be completed safely and efficiently.